Cherry Creek North Townhome Remodel: A Second-Floor Laundry Where None Existed

Kitchen island and cherry cabinetry seen from the dining side, with recessed lighting overhead

Project Information

Project size About 2,900 sq ft of a 3,796 sq ft townhouse
Timeline August 20 – October 20, 2026 (8 weeks, permits and inspections included)
Location Monroe Street, Cherry Creek North, Denver, CO 80206
Contractor Verified Builders
Category Full House Remodeling
Project type Whole-home townhouse remodel in Cherry Creek North, Denver
Scope Kitchen, primary bathroom, new second-floor laundry, basement, hardwood floors
Client Anna S.
Call or fill out our form for a free consultation today!

Five spaces on one schedule. The whole remodel, permits and inspections included, took eight weeks.

Whole-home remodel · Monroe Street, Cherry Creek North
The project

A whole townhouse, planned as one job

The homeowners bought a 1994 three-bedroom townhouse on Monroe Street in Cherry Creek North, Denver, and wanted the work done all at once instead of room by room. We planned it as one eight-week schedule, with the permit and every inspection inside that window.

2,900
sq ft remodeled
8
weeks, permits included
5
spaces updated
On time
finished per contract

Verified Builders remodeled a 1994 three-bedroom townhouse on Monroe Street in Denver's Cherry Creek North neighborhood in eight weeks, from August 20 to October 20, 2026, including permits and inspections. The whole-home remodel covered about 2,900 of the home's 3,796 square feet: a kitchen update with Silestone quartz counters, a primary bathroom with a freestanding soaking tub and tiled walk-in shower, a new second-floor laundry room, a refreshed basement, and new hardwood floors. Project manager Solomon ran the job on one schedule.

After: a Cherry Creek North townhome, kitchen to basement

Watch: the finished bathroom, kitchen and basement in Cherry Creek North

The primary bathroom: freestanding tub under the skylight, walk-in shower and double vanity (0:17)
The kitchen, main-floor living room and basement (0:20)
The story

One remodel instead of five small jobs

The remodel covered about 2,900 of the townhouse's 3,796 square feet, so we planned it as one whole-home remodel instead of separate jobs. We updated the kitchen, rebuilt the primary bathroom, added a laundry room on the second floor, refreshed the basement, and put down new hardwood. Recessed lighting, new ceiling fans, and fresh Sherwin-Williams paint went in across the house.

Cream quartz perimeter countertops and backsplash beneath cherry wall cabinets and range hood

The homeowners were also careful with their budget. They kept the green-veined stone top on the kitchen island and the cabinets under the bathroom vanity. We planned the project around both, choosing new finishes that sit comfortably next to what stayed.

Work started August 20 and wrapped October 20, 2026, on the schedule in the contract. The permit took about a week, and the inspections fit inside the same eight weeks. Two other projects ran on a similar plan: a whole-home renovation in Wash Park and a whole-house remodel in Arvada.

Freestanding soaking tub beneath a skylight and plantation shutters in the remodeled primary bathroom
The freestanding tub under the skylight
Primary bathroom double vanity with the original cherry cabinets, new white countertop and wall sconces
New vanity top on the original cabinets
Basement living room with a full wall of wood built-ins and shuttered windows
The basement living room, refreshed

"Solomon and his crew did the most amazing job in our North Cherry Creek townhome. His team showed up when they said they would. Solomon paid meticulous attention to every step of the process. I would highly recommend Verified Builders."

Anna S., Cherry Creek North, Denver
Old vs. new

What stayed and what we added

Keeping a few solid pieces let the homeowners put more of the budget into the rooms that needed it most.

What stayed

Kept to save money

  • The green-veined stone countertop on the kitchen island
  • The existing vanity cabinets in the primary bathroom
  • The home's overall layout
What we added

New work

  • Silestone quartz perimeter counters in Linen Cream, picked to complement the island
  • A new vanity top, sinks, faucets, and hardware on the original cabinets
  • A freestanding soaking tub and a fully tiled walk-in shower
  • A laundry room on the second floor, where there was no plumbing or power for one before

The big moves

▣

A laundry room where none existed

The homeowners wanted laundry on the second floor, close to the bedrooms. That part of the house had no water lines or laundry circuit. We ran new plumbing and electrical, framed and drywalled the space, and tied it into the existing layout.

▦

A primary bath built from the studs

This primary bathroom remodel started at the framing. We built new 2x4 pony walls to fit the shower layout, added R-21 insulation, and lined the shower with GoBoard waterproof backer before any tile went up. A Signature Hardware Boyce 65" freestanding soaking tub now sits under the skylight.

▨

Hardwood through the house

New hardwood went into the main living areas, sealed with Bona NaturalSeal and topped with Bona Traffic in satin. The transitions between rooms were finished by hand.

◫

A basement that matches upstairs

The basement living space got the same treatment as the floors above: drywall repairs, matched texture, new flooring, lighting, and paint. It's the same order of work we follow on any basement remodel.

Design decisions

New finishes chosen around what stayed

Most of the choices on this job came back to two kept pieces: the island top and the vanity cabinets.

◯

Keep the island top, match around it

The green-veined stone on the island was in good shape, so the homeowners kept it. For the perimeter counters on this kitchen remodel, we chose Silestone Linen Cream because its warm tone works next to the green. It saved money without leaving the kitchen looking half-finished.

◻

A sand-toned backsplash

Bedrosians Marin tile in Sand Dollar, 2.5" by 5", runs behind the cream counters. The small format and soft color keep the wall quiet so the cherry cabinets and the shuttered window over the sink stay the focus.

▣

Large-format tile on the bath floor

Luxe Fog porcelain in 24" by 48" planks covers the bathroom floor with very few grout lines. The shower floor uses the same color in a small square mosaic, which adds grip underfoot. Artisan Frost matte ceramic in 2.5" by 16" lines the shower walls.

☉

Freestanding tub under the skylight

The Boyce is a 65" acrylic double-slipper tub with foam insulation that helps hold heat. Its drain and overflow are built into the tub walls, so no pipes show. The filler and a handheld sprayer are mounted on the ledge behind it, and the skylight above puts natural light right on the water.

Materials

What went into the house

Silestone
Quartz perimeter countertops in Linen Cream
Bedrosians
Marin kitchen backsplash tile in Sand Dollar, 2.5" by 5"
Artisan Frost
Matte ceramic shower wall tile, 2.5" by 16"
Luxe Fog
Porcelain bath floor planks, 24" by 48", with a matching shower-floor mosaic
Signature Hardware
Boyce 65" acrylic freestanding soaking tub
Delta
Shower system and fixtures, through Ferguson
Panasonic
Bathroom exhaust fan
GoBoard
Waterproof shower backer board
Bona
NaturalSeal and Bona Traffic Satin on the hardwood
Urban Lights
Ceiling fans, plus recessed lighting through the house
Sherwin-Williams
Interior paint
Timeline

Eight weeks, permit to handoff

August 20 to October 20, 2026, with permits and inspections inside the same eight weeks.

Week 1
Permit
About a week to get the permit approved before work could start.
Weeks 2–3
Rough work
Framing for the shower pony walls and the new laundry room. Plumbing and electrical run to the second floor.
Week 4
Inspections & close-up
Rough inspections. R-21 insulation, GoBoard in the shower, drywall and texture.
Weeks 5–7
Tile, counters & floors
Shower and bath tile set. Quartz counters and backsplash installed. Hardwood laid and finished.
Week 8
Fixtures & finish
Tub, Delta fixtures, vanity top, lighting, and fans installed. Paint, final inspection, and handoff on October 20.
FAQ

Remodeling a Cherry Creek North townhome, answered

The questions homeowners ask us most about whole-home remodels in Denver.

Can you remodel a whole house in eight weeks?

Sometimes, if the scope is clear before work starts and the layout stays mostly the same. This Cherry Creek North townhome took eight weeks, permits and inspections included. Moving walls or adding square footage usually takes longer.

Do I need a permit to remodel in Denver?

Yes, for most plumbing, electrical, and structural work. On this project the new laundry room needed new plumbing and electrical, so it was permitted and inspected along with the bathroom work.

Can I keep some of my existing finishes to save money?

Yes. These homeowners kept their kitchen island countertop and bathroom vanity cabinets. We picked new materials to complement what stayed. Keeping solid pieces is one of the simplest ways to stretch a remodel budget.

How hard is it to add a laundry room on a second floor?

It depends on how close the space is to existing water lines and drains. Here we ran new plumbing and a dedicated circuit to a part of the house that had neither.

What does a freestanding tub need that a built-in tub doesn't?

A floor that can carry the weight when full, a drain in the right spot, and a plan for the filler, either floor-mounted or on a nearby wall or ledge. In this bath the filler sits on the ledge behind the tub, and the Boyce tub has its drain and overflow built into the tub walls.

What's different about a townhouse remodel?

Shared walls and, often, an HOA. Many townhouse communities in Denver ask for approval before structural or exterior changes, so read your HOA documents first. Shared walls also limit where new plumbing lines and vents can run.

Should I hire one contractor for a whole-home remodel?

For a project with this many parts, one general contractor is usually simpler. On this Cherry Creek North townhouse remodel, Solomon ran construction management for the kitchen, bathroom, laundry, basement, and flooring on one schedule, and our team lined up the trades and inspections. Hiring separate remodeling contractors for each room means separate schedules, which is hard to fit into eight weeks.

Planning a remodel in Cherry Creek North or anywhere in Denver?

Tell us your timeline and we'll tell you honestly what fits inside it.

Book a free estimate

Verified Builders provides kitchen, bathroom, basement, and whole-home remodeling services in Cherry Creek, Cherry Creek North, Hilltop, Washington Park, Bonnie Brae, and the greater Denver, Colorado area.

Scroll to Top