Whole House Remodel in Arvada: The Wall Came Down and the Kitchen Opened Up

Open-concept kitchen and living space after a whole house remodel in Arvada, CO, with refinished oak hardwood floors, a two-tone island kitchen, and a new staircase railing

Project Information

Project Type: Whole House Remodel in Arvada
Client: Private homeowner (name withheld by request)
Location: Lupine Way, Arvada, CO 80007
Call or fill out our form for a free consultation today!

One load-bearing wall stood between this family and the open kitchen they wanted. We engineered it out.

Whole house remodel · Lupine Way, Arvada
The project

A closed-off kitchen, opened to the whole house

The kitchen was boxed in. A load-bearing wall split it off from the rest of the main floor, so the family cooked in one room and lived in another. They wanted the whole 3,500 square feet to feel like one house.

That wall held up the floor above it, so opening it up meant real structural work. A licensed engineer drew a beam to carry the load, we pulled the permit through the City of Arvada, and the wall came out.

3,500
sq ft remodeled
~600
sq ft new kitchen
~16
weeks, start to finish
1
load-bearing wall removed

Before: a boxed-in kitchen and dated finishes

After: one open floor plan, top to bottom

Watch the transformation

Finished walkthrough
Before & after
The story

The wall was holding up the house

From there the work ran the length of the house. A new custom kitchen. A master bath rebuilt from the tub up. Hardwood refinished in every room, a new railing, a moved laundry room, and fresh paint wall to wall.

The kitchen and the living space became one room. Start to finish, the whole house took about sixteen weeks.

Great room mid-remodel in Arvada with the load-bearing wall opened to the studs
Old vs. new

What was there, and what we built

The scope in two columns — the original layout on the left, the remodeled home on the right.

What was there

The original layout

  • Kitchen closed off by a load-bearing wall
  • An old garden tub in the master bath
  • Dated cabinets and laminate counters
  • Worn hardwood and a white-painted railing
  • Laundry tucked in an awkward spot
What we built

The remodeled home

  • One open kitchen and living space, wall removed
  • A walk-in shower with backlit mirrors
  • Custom frameless cabinets and quartz counters
  • Refinished hardwood throughout and a new railing
  • A relocated laundry that fits the family

The big moves

One open floor plan

Removing the load-bearing wall turned two rooms into one. A licensed engineer sized the beam, and the City of Arvada approved it before demo started.

Refinished hardwood, everywhere

We sanded and refinished the original oak floors through the whole house, so the main floor reads as one continuous space.

New railing, fresh paint

The white railing became stained wood with black metal balusters, and every wall got repainted in Sherwin-Williams.

Design decisions

The details that make it work

Smaller choices that change how the house lives day to day.

Frameless Slim Shaker cabinets

Frameless boxes open wider and reach deeper, so you get more usable space. The Slim Shaker door keeps the look clean. These came from Designers Choice Cabinetry.

Outlets under the cabinets

We ran the kitchen outlets under the upper cabinets instead of into the backsplash, so the quartz runs unbroken. Under-cabinet lighting went in on the same run.

Tub out, walk-in shower in

The master bath lost the garden tub and gained a walk-in shower with new tile from The Tile Shop, new cabinets, and backlit mirrors. Easier to use now, easier to age with later.

A moved laundry room

We relocated the laundry to a spot that fits how the family lives, with a stacked washer and dryer tucked in off the remodeled bath.

Materials

What we built it with

Designers Choice Cabinetry
Custom frameless Slim Shaker cabinets in the kitchen and baths.
Dorado Surfaces
Quartz countertops and the kitchen backsplash.
Shower and bathroom tile, including the walk-in shower.
Whole-house interior repaint.
Timeline

About sixteen weeks, March to July 2026

Weeks 1–2
Permits & demo
Permit pulled through the City of Arvada. Demo of the kitchen and master bath, floors protected, the engineer’s beam plan finalized.
Weeks 3–5
Structure & rough-in
Load-bearing wall removed and the beam set. Rough plumbing and electrical for the new kitchen, the shower, and the moved laundry.
Weeks 6–9
Kitchen & bath build
Custom cabinets and quartz counters installed, backsplash set. Master bath tiled, the walk-in shower built, new cabinets and backlit mirrors hung.
Weeks 10–13
Finishes
Hardwood refinished through the whole house. New railing installed. Full interior repaint in Sherwin-Williams.
Weeks 14–16
Punch & handoff
Final inspection with the City of Arvada. Punch list closed out. Keys back to the homeowner.

Permitted and inspected through the City of Arvada at every stage. — Tomer Siso, project manager

Project details

The specs

LocationLupine Way, Arvada, CO 80007
Home size3,500 sq ft
Kitchen size~600 sq ft
TimelineMarch 30 – July 21, 2026 (about 16 weeks)
Project managerTomer Siso
PermitsCity of Arvada
EngineeringStamped beam design for the load-bearing wall
ScopeKitchen, master bath, whole-house hardwood refinish, new railing, moved laundry, full repaint
MaterialsDesigners Choice Cabinetry, Dorado Surfaces, The Tile Shop, Sherwin-Williams
StatusCompleted July 2026
FAQ

Whole house remodels in Arvada, answered

How much does a whole house remodel cost in Arvada or Denver?

Cost tracks scope and finish level more than square footage. Structural work, custom cabinets, and stone counters move the number most. The most accurate figure comes from a walkthrough and a line-item estimate, which is where we start.

Can you remove a load-bearing wall to open up a kitchen?

Yes, with a stamped plan and a permit. A licensed structural engineer sizes a beam to carry what the wall was holding, and the city reviews it before demo. On this project the City of Arvada approved the beam design first.

Do I need a permit to remodel a house in Arvada?

Yes. Structural changes, plumbing moves, and electrical work all pull permits through the City of Arvada. We opened and closed the permits on this remodel, including the wall removal and the moved laundry. Permitted work is also inspected work, which protects resale later.

How long does a whole house remodel take?

For a full-scope job like this one, plan on three to five months. This Arvada remodel ran about sixteen weeks and covered structural work, a new kitchen, a master bath, floors, and paint. Timelines stretch when material lead times or change orders pile up.

Is it better to remodel a whole house at once or room by room?

Doing it at once is usually faster and cheaper per room. You pull one permit and mobilize one crew, and the messy work happens in a single stretch. For this family, one whole-house push made more sense than spreading it over years.

Planning a whole house remodel in Arvada or the Denver metro?

Tell us what you want to change and we’ll walk the house with you.