Kitchen Remodel in Arvada: A California Kitchen in Taj Mahal and Tempest Blue

Remodeled kitchen in Arvada, CO with a Tempest Blue quartzite island, white Shaker cabinets and a Thermador pro range under a stainless chimney hood

Project Information

Project size About 300–350 sq ft kitchen, about 800 sq ft of flooring
Timeline June – September 2026 (about 13 weeks)
Location W 62nd Pl, Arvada, CO 80403
Contractor Verified Builders
Category Kitchen Remodel
Project type Kitchen Remodel in Arvada (wall removal and new main floor)
Scope Kitchen remodel, wall removal, main-floor flooring, white oak stairs and railing, lighting, and paint
Permits City of Arvada
Client Private homeowner
Call or fill out our form for a free consultation today!

She wanted a bigger kitchen, like the one in her California house. We took out the wall that boxed it in and rebuilt the main floor around it.

Kitchen remodel · W 62nd Pl, Arvada
The project

A bigger kitchen, modeled on her California home

The homeowner came to us with a clear vision. She wanted a bigger kitchen, like the one in her home in California. The kitchen she had in Arvada sat behind a wall, reached through a pass-through counter and arched doorways.

That wall carried no load, so it came out without a beam. The kitchen took over the space. From there, the work spread across the main floor, with new flooring, white oak stairs, new lighting, and paint.

The kitchen remodel took about 13 weeks of construction and cost $151,350. That covers our labor and the materials we supplied. She bought the Thermador appliances, the flooring, and the backsplash herself.

300–350
sq ft kitchen
~800
sq ft of engineered wood
13
weeks, start to finish
$151,350
final project cost

Before: a kitchen behind a wall, an oak railing, and carpeted stairs

After: an open kitchen in Taj Mahal and Tempest Blue quartzite

Watch: the finished kitchen, the quartzite island, and the white oak stairs

A walkthrough of the finished kitchen in Arvada (0:57)
Want the before and after version? Watch it here.
The story

The wall came out with no beam needed

On our whole house remodel on Lupine Way, the wall we removed held up the floor above and needed an engineered beam. This wall carried no load. It came straight out.

It still needed permits. As the general contractor, we pulled building, plumbing, electrical, and mechanical permits through the City of Arvada before demo.

With the wall gone, the kitchen had room to grow. Then the rest of the floor followed. About 800 square feet of engineered wood went down across the main level, and the carpeted stairs became white oak.

She also wanted room for her art. So we squared off one of the arched openings to give her that space.

Before and after: kitchen remodel, Arvada CO

Drag the handle on each photo to compare the old kitchen with the new one.

Before: the wall separating the kitchen from the front entry, with ceiling drywall opened above it and blue tape marking the floor After: open kitchen with a dark-stained island topped in Tempest Blue quartzite, white Shaker cabinets and a stainless column refrigerator
A wall split the kitchen from the front entry. Now it opens to the whole floor.
Before: the original kitchen with cream raised-panel cabinets, granite counters, a brown mosaic tile backsplash and stainless appliances After: white Shaker kitchen with brass pulls, Taj Mahal quartzite perimeter counters, a Tempest Blue quartzite island and a built-in Thermador refrigerator
Cream cabinets and granite became white Shaker, Taj Mahal, and a Tempest Blue island.
Before: raised pass-through counter and arched doorway into the original kitchen, with a Tiffany-style chandelier overhead After: open kitchen with white Shaker cabinets, Taj Mahal quartzite counters, a dark-stained island and the new stair railing beyond
A pass-through counter and an arched doorway became one open run of cabinets and counters.
Before: honey oak stair railing with white spindles, an arched wall niche and oak strip flooring on the main floor After: white oak stair railing with painted white newel posts and handrail, iron balusters and engineered wood flooring
The oak railing with white spindles became white oak, painted, with iron balusters.
Old vs. new

What was there, and what we built

The same main floor in Arvada, before and after the kitchen remodel.

What was there

The walled-off kitchen

  • A kitchen walled off from the front entry
  • A pass-through counter and arched openings
  • Cream raised-panel cabinets and granite counters
  • Oak strip floors and carpeted stairs
  • An oak railing with white spindles
What we built

The open kitchen

  • One open kitchen, with the wall removed
  • A squared-off arch, with space for her art
  • Custom white Shaker cabinets and a dark-stained island
  • Taj Mahal and Tempest Blue quartzite counters
  • About 800 sq ft of engineered wood and white oak stairs
  • A white oak railing with iron balusters

The big moves

Three decisions shaped this Arvada kitchen remodel.

▣

One open kitchen

The wall came out with no beam needed. The kitchen now runs straight into the dining and living space.

▦

One floor, end to end

About 800 sq ft of engineered wood replaced the old oak strips. Kitchen, dining, and living now read as one room.

▨

White oak stairs and railing

The carpeted stairs became white oak. The railing is white oak too, painted white, and iron balusters replaced the old white spindles.

Design decisions

The kitchen design details that make it work

Smaller kitchen design choices that change how the space looks and works day to day.

◫

Two quartzites, one kitchen

Taj Mahal runs the perimeter in soft cream with light veining. The island gets Tempest Blue, a Brazilian quartzite in blue-gray with green and copper veining. The quiet stone lets the island carry the color. Our guide to countertop materials for busy kitchens compares quartzite with the other options.

◯

Custom cabinetry in two finishes

Designers Choice built the custom cabinetry. White Shaker with brass pulls lines the walls, and the island is stained dark to stand apart from them.

◻

Square recessed lights

We chose 4-inch square recessed lights for a more modern look. LED under-cabinet lighting runs along the counters.

▣

An island that does the work

The island holds a built-in microwave drawer and deep drawer stacks. The homeowner supplied the Thermador appliances through Ferguson.

Materials

What we built it with

The materials in this Arvada kitchen, and what each one does.

Custom cabinetry: white Shaker on the perimeter and a dark-stained island.
Taj Mahal quartzite
The perimeter countertops, in a soft cream with light veining.
Tempest Blue quartzite
The island top, 3 cm thick and quarried in Brazil: blue-gray with green and copper veining.
Range, refrigeration, and microwave drawer, through Ferguson. Supplied by the homeowner.
Engineered wood flooring
About 800 sq ft across the main floor. Supplied by the homeowner.
White oak stairs and railing
White oak treads and railing, with the posts and handrail painted white and iron balusters.
Timeline

About thirteen weeks, June to September 2026

About 13 weeks from permits to handoff, with time built in for the homeowner’s design changes along the way. Tomer Siso managed the project, and the permits went through the City of Arvada.

Weeks 1–2
Permits & demo
Building, plumbing, electrical, and mechanical permits pulled through the City of Arvada. The old kitchen and the wall came out, with the floors protected.
Weeks 3–4
Rough-in
Plumbing, electrical, and mechanical rough-in for the new layout. Wiring for the 4-inch square recessed lights and the under-cabinet LEDs.
Weeks 5–7
Design changes & cabinets
She asked for changes as the kitchen took shape, and we worked them in as we went. Custom cabinetry installed once the layout was final.
Weeks 8–9
Countertops
Both quartzites templated, cut, and installed. Backsplash tiled.
Weeks 10–11
Floors & stairs
About 800 sq ft of engineered wood laid across the main floor. White oak stairs and railing built.
Week 12
Paint & lighting
Squared off the arch, painted the whole floor, and finished the lighting.
Week 13
Punch & handoff
Thermador appliances in, final inspections, punch list closed, and keys back to the homeowner.
Project details

The specs

LocationW 62nd Pl, Arvada, CO 80403
Kitchen sizeAbout 300–350 sq ft
FlooringAbout 800 sq ft of engineered wood
TimelineJune – September 2026 (about 13 weeks)
Cost$151,350, not including the owner-supplied appliances, flooring, and backsplash
Project managerTomer Siso
PermitsBuilding, plumbing, electrical, and mechanical, City of Arvada
WallNon-load-bearing, removed with no beam needed
ScopeKitchen, wall removal, squared archway, main-floor flooring, white oak stairs and railing, recessed and under-cabinet lighting, and paint throughout
MaterialsDesigners Choice Cabinetry, Taj Mahal quartzite, Tempest Blue quartzite, and Thermador
Warranty1 year on the project
StatusComplete, September 2026
FAQ

Kitchen remodels in Arvada, answered

The questions Arvada homeowners ask us most about a kitchen remodel like this one.

Is quartzite a good countertop for a kitchen?

Yes. Quartzite is a natural stone that’s much harder than marble and stands up to heat, which suits a busy kitchen. It does need a penetrating sealer, so ask your fabricator how often to reseal it. This kitchen uses two Brazilian quartzites: Taj Mahal on the perimeter and Tempest Blue on the island.

Can you use two different countertops in one kitchen?

Yes, and the island is the usual place to switch. A calm stone on the perimeter keeps the walls quiet, and a bolder slab on the island becomes the focal point. Here, cream Taj Mahal runs the perimeter and blue-gray Tempest Blue tops the island. Look at the two slabs side by side before you commit.

How do you know a wall isn’t load-bearing before you remove it?

You check what sits on top of it. A wall that carries floor joists, a beam, or roof load from above is load-bearing. This one carried nothing, so it came out with no beam. Our guide covers how to tell if a wall is load-bearing, and a contractor or engineer should confirm it before demo.

What permits does a kitchen remodel need in Arvada?

It depends on the work. This one needed four: building, plumbing, electrical, and mechanical. We pulled all of them through the City of Arvada before work started. The wall carried no load, so no beam was needed. Our page on remodeling in Arvada explains how permits work in the city.

Can I supply my own appliances, flooring, or backsplash?

Yes. On this project, the homeowner bought the Thermador appliances through Ferguson, plus the engineered wood flooring and the backsplash tile. We supplied everything else. The $151,350 project cost doesn’t include what she bought, so tell your contractor up front which items you plan to buy yourself.

Planning a kitchen remodel in Arvada or Golden?

Tell us what you want from your kitchen remodel, and we’ll walk your home with you. We’re licensed in Arvada, CO, and we pull the permits on every project.

Book a free estimate

Share this project

Scroll to Top